Bathroom Remodel Costs

 
 

Economic

Economic remodels consist of surface-level changes:

  • Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)

  • Porcelain Tile Floor & Shower Walls

  • Good Level Plumbing Fixtures

  • Good Level Vanity Cabinetry

  • Granite/Quartz Remnant Top

  • Electrical Changes/Updates

  • Custom Shower Doors

  •  Fixtures Remain in the Same Locations

For a hall bathroom, this option typically costs around $35k

For a primary bathroom, this option typically costs around $60k


Improved

Improved remodels allow some deeper alterations:

  • Remove Existing Tub & Shower. Expand Existing Shower with Mudbase

  • Tile Shower (Tub is Not Included)

  • Porcelain Tile Floor, Shower Base & Walls

  • Better Level Plumbing Fixtures

  • Better Level Vanity Cabinetry

  • Granite/Quartz Remnant Top & Shower Pieces

  • Electrical Changes/Updates

  •  Custom Shower Doors

  •  Limited Fixture Movement

For a hall bathroom, this option typically costs around $42k

For a primary bathroom, this option typically costs around $70k


LUXURIOUS

Luxurious remodels are deep-level renovations:

  • Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile

  • Shower with Seat

  • Natural Stone Floor, Shower Base & Walls

  • Best Level Plumbing Fixtures

  • Better or Best Level Vanity Cabinetry & Linen Cabinets

  • Granite/Quartz Remnant Top & Shower Pieces

  • Electrical Changes/Updates

  •  Custom Shower Doors

  •  Fixtures May be Moved

For a hall bathroom, this option typically costs around $50k+

For a primary bathroom, this option typically costs around $80k+


Powder Room

A powder room, which typically is used for guests and only includes a sink and a toilet:

  • Plumbing Fixtures

  • Level Vanity Cabinetry

  • Granite/Quartz Remnant Top

  • Electrical Changes/Updates

  • Paint Walls & Trim

Typically, a powder room costs around $15k

NOTE: This is just an estimate. The prices are due to increase/decrease depending on the projects’ circumstances.